Project Maps
The map (below) is prepared by the construction contractor – Great Lakes Dredge & Dock Company – to show their current projection of beach nourishment construction activity, on a weekly basis. Actual limits and calendar schedules will change as work progresses. The map will be updated weekly, more or less. [“Subline” refers to the approximate anticipated locations of the temporary pipeline through which the hopper dredge ship will transfer its loads of sand to the beach, for subsequent placement and grading]