An oblique aerial view of construction operations between Sadler Road and Cleveland Avenue (June 24, 2025). Note the diked area and the yellow extractor screening the dredge slurry.

An oblique aerial view of construction operations, looking southward toward the Seaside Park Beach Access at Sadler Road (June 24, 2025).

An oblique aerial view of the dredge Savannah offshore of St. Marys Inlet and Fernandina Beach (June 24, 2025).

An oblique aerial view of construction operations at Main Beach (May 27, 2025). Note the Extractor screening all the sand slurry into diked areas on the beach.

An oblique webcam view of the construction area on the first day of sand placement (May 20, 2025).
Webcam: https://www.seasideameliainn.com/beach-cam (CoastalCameraNetwork.com)

An oblique aerial view of pre-construction conditions at Dolphin Street / Main Beach (May 14, 2025). Note the pipeline coming ashore from the offshore borrow area.

A webcam image of Main Beach and the mobilized beach nourishment equipment awaiting construction start (May 13, 2025).
Webcam: https://www.seasideameliainn.com/beach-cam (CoastalCameraNetwork.com)

Dredge Savannah, Marinex Construction, Inc.

A photograph of the Dredge Savannah at work in the borrow area off Amelia Island (July 27, 2021).

A photograph of the Dredge Savannah at work in the borrow area off Amelia Island (July 27, 2021).

EXAMPLE of sand screening “Extractor” in use on the 2024 Ponte Vedra Beach nourishment project.
The NCSPP will utilize the same equipment.

EXAMPLE of beach fill work zone with sand screening “Extractor” in use on the 2024 Ponte Vedra Beach nourishment project.
The NCSPP will utilize the same equipment.