Project Photos
October 4th, 2016 – South End Truck Haul Initial Progress
September 27th, 2016 – South End Truck Haul Initial Progress
September 27th, 2016 – New Pass dredging and beach nourishment
Before & after photos.
September 21st, 2016 – New Pass dredging and beach nourishment
The dredge Pullen finishing up operations at New Pass.
September 8th, 2016 – New Pass dredging and beach nourishment
Norfolk Dredging Company’s dredge Pullen making progress across the New Pass ebb shoal borrow area.
August 19th, 2016 – Dredge Pullen
Norfolk Dredging Company’s dredge Pullen is a hydraulic cutterhead-suction pipeline dredge, approximately 150 ft in length and 40 ft wide. The dredge utilizes 6,500 horsepower 24” on-board pumps to pump sand and water from the channel borrow area through a pipeline to the beach. No additional booster pumps are used.
June 15th, 2016 – Segment 4 and beach tiller equipment
June 12th, 2016 – Segment 3 – Aerial Innovations, Inc
Tropical Storm Colin (pre- & post-storm)
Segment 3 construction (18-19 May 2016)
Segment 1 construction (9 May 2016)
Completion of Segment 1 (Aria to Seaplace)
Day One of Construction (6 April 2016)
Sand Source: Stewart Materials, Inc. – Immokalee mine in Collier County, FL
Sand currently being stockpiled for the upcoming Central Key Beach Nourishment Project, set to begin in early April 2016.